A turnkey bathroom delivery service under a single point of responsibility

“The OTIF way”

We deliver complete bathroom packages for main contractors, in the ”OTIF Way.

Why the OTIF Way?

On Time, In Full

The
OTIF Way
Traditional
Approach
Teams to appoint, plan & coordinate 1 Up to 13
Surveys 1 4
Drawings 1 3
Typical Programme 30% saving No saving
Start manufacture of bespoke items Week 1 Week 6

What we do..

We take full ownership from shell to handing over fully finished, tested, and snag-free bathrooms – with one point of responsibility and the OTIF programme certainty.

We remove friction from bathroom delivery by replacing multi-trade complexity with one accountable package. We standardise the build process, align every interface (structure, MEP, waterproofing, finishes, screens/joinery), and hand back completed bathrooms that protect programme and reputation—so projects run smoother, teams collaborate better, and outcomes are right first time.

Our mission

“Give main contractors programme certainty, consistent quality and predictable cost through a disciplined, repeatable process”

“One point of responsibility, full owership”

Your Questions,

answered……

  • OTIF can undertake these works unless the client prefers their sub-contractors to carry out the work, in which case OTIF will coordinate, mark the position of all fittings, and confirm the required dates in advance.

  • OTIF can undertake these works unless the client prefer it is done their contractors, in which case OTIF will coordinate, mark the position of all fittings, and confirm dates in advance.

  • OTIF will supply and install the door linings These are set out in relation to the site grid lines. The door set usually remains part of the doors package to insure consistency throughout

  • OTIF will apply soft spill-proof felt and fluted board protection for light foot traffic. The main contractor may need to upgrade and maintain the protection to suit their subsequent activities.

  • Access into the bathroom will be by arrangement and controlled by a permit system. 

  • OTIF will connect the waste pipes to the SVP. The main contractor is responsible for coordinating with the building manager.

  • The OTIF programme, from when the shell is available up to hand over the completed, will be issued and agreed with the main contractor to suit the overall construction programme